Project
Name: Turbine Generator No. 6
Owner: Groton Subbase,
Groton, CT
Contract Amount: $6,134,000
Completion Date: December 1996
|
| Project Scope:
The project consisted of installing a cogeneration plant at
the boiler plant (Building 29). The project was high tech in
nature which involved providing and installing a 5 mega watt
turbine generator, a 50,000 lbs waste heat recovery boiler and
a gas boost compressor. In addition to the above, two (2) small
additions were installed, one of which was a 20’ high poured
in place concrete shell and the other was a small metal building.
The foundations consisted of wood sheet piling with massive
concrete equipment foundations. Also included in the scope of
work was a complete new electrical distribution system for the
new facility.
|